Application Documents
The links below will take you to the Construction Certificate application documents filed with the Kentucky State Board on Electric Generation and Transmission Siting for Bright Mountain Solar. An overview of the Siting Board’s process is available here:
Tab 2 (Proposed Site Description)
Tab 3 (Public Notice Evidence)
Tab 4 (Compliance with Local Ordinances and Regulations)
Tab 7 (Efforts to Locate Near Existing Electric Generating Facilities)
Tab 9 (Effect on the Electric Transmission System in Kentucky)
Tab 11 (Environmental Violation)
Tab 12 (Site Assessment Report)
Tab 13 (Description of the Proposed Electric Transmission Line, Route, and Appurtenances)